Landscaping Job Bid Calculator

Build a project quote from materials, labor, equipment, overhead, and a selected markup.

Inputs

Range: at least 0 $

Enter material costs included in the job estimate.

Range: at least 0 hours

Enter total labor hours across the crew.

Range: at least 0 $ per hour

Use the contractor's loaded labor cost, including the costs the business intentionally allocates to labor.

Range: at least 0 $

Include equipment rental, disposal, hauling, or other direct job costs.

Range: at least 0 %

Enter the overhead percentage used by the business; no industry default is assumed.

Range: at least 0 %

This tool applies markup after overhead, using the entered percentage on cost.

Result

Cost after overhead ($)
—
Direct cost ($)
—
Labor cost ($)
—
Overhead amount ($)
—
Estimated customer quote ($)
—